Registration for the People's Solar Project is open now, and the steps are simple — but their order matters. The meter-name check comes before the portal, the portal comes before the installer, and the installer comes before any invoice you want to count. Follow this order and the process is smooth. Skip a step and you create the exact problem the later steps cannot fix.
Before you register: the five checks
Check one: you are a Thai national. Check two: your home is on residential tariff category 1, not a temporary meter and not a condominium. Check three: your name matches the meter owner name — if it does not, visit the electricity authority and change it now. Check four: your planned system is 5 to 10 kilowatts. Check five: you will use MEA, PEA or a registered vendor. If any check fails, fix it first. Registration does not fix eligibility problems; it records them.
Registering: portal, ThaiD, and service points
Register online at peoplesolar.mea.or.th, or in person at a one-stop service point at your electricity authority, where participating banks also serve customers. Online identity verification uses the ThaiD application; in-person verification happens at the local authority office. Have your Thai ID and your meter details ready before you start, and save or photograph your registration confirmation — it is your proof of place in the queue if anything is disputed later.
Registration is free. Nobody may charge you to register, reserve a slot, or move you up the queue. If anyone asks for a fee, walk away and report them through the utility's official channels.
After registration: survey, contract, installation, connection
After registration, an accredited vendor inspects your site for roof strength, orientation and shading, and confirms the system size your home can actually support. Surveys are due by 30 June 2027. Sign the contract only with a registered route, and check that every tax invoice is dated from 27 October 2026 onward. After installation, request grid connection through the MEA MyEnergy system or the PEA PPIM system by 31 August 2027, and complete the connection by 30 September 2027. If all conditions are met, the 50,000 baht is paid by 31 December 2027 — to your PromptPay account if you paid cash, or directly to your bank if you took a loan.